2. State of the Power Sector during FY2021
•
•
2.3 Progress of transmission and distribution of electricity
Transmission and distribution lines have increased during FY2021
The length of transmission and distribution lines has increased at a slower
pace compared to that of generation (3.7% and 5.9% respectively vis-à-vis
8%) during FY2021
Dearth of transmission and distribution lines are mentioned as a major reasons
for load shedding
Surprisingly, official data indicates no load-shedding in the country
(between July, 2019 and June, 2021)
Transmission and distribution of electricity in FY2021
Load-shed of 01/07/2019
Load-shed of 16/06/2021
Changes
FY2019 FY2020 FY2021
between
2019 and
2020
Changes
between
FY2020 and
FY2021
Area
Load
Shedding
Load
Area
Shedding
Dhaka
0
Dhaka
0
Chittagong
0
Chittagong
0
Transmis
sion line
Khulna
0
Khulna
0
Rajshahi
0
Rajshahi
0
(ckt km)
11,650 12,283 12,744
633 (5.4%)
461 (3.7%)
Comilla
0
Comilla
0
Distributi
Mymensingh
0
Mymensingh
0
on
line
(km)
5,24,000 5,77,479 612000
Source: Author's calculation from the data of BPDB annual reports
53,479
(10.2%)
34,521
Sylhet
0
Sylhet
0
(5.98%)
Barisal
0
Barisal
0
Rangpur
0
Rangpur
0
Total
0
Total
0