Investor Presentaiton slide image

Investor Presentaiton

2. State of the Power Sector during FY2021 • • 2.3 Progress of transmission and distribution of electricity Transmission and distribution lines have increased during FY2021 The length of transmission and distribution lines has increased at a slower pace compared to that of generation (3.7% and 5.9% respectively vis-à-vis 8%) during FY2021 Dearth of transmission and distribution lines are mentioned as a major reasons for load shedding Surprisingly, official data indicates no load-shedding in the country (between July, 2019 and June, 2021) Transmission and distribution of electricity in FY2021 Load-shed of 01/07/2019 Load-shed of 16/06/2021 Changes FY2019 FY2020 FY2021 between 2019 and 2020 Changes between FY2020 and FY2021 Area Load Shedding Load Area Shedding Dhaka 0 Dhaka 0 Chittagong 0 Chittagong 0 Transmis sion line Khulna 0 Khulna 0 Rajshahi 0 Rajshahi 0 (ckt km) 11,650 12,283 12,744 633 (5.4%) 461 (3.7%) Comilla 0 Comilla 0 Distributi Mymensingh 0 Mymensingh 0 on line (km) 5,24,000 5,77,479 612000 Source: Author's calculation from the data of BPDB annual reports 53,479 (10.2%) 34,521 Sylhet 0 Sylhet 0 (5.98%) Barisal 0 Barisal 0 Rangpur 0 Rangpur 0 Total 0 Total 0 10
View entire presentation