Generating Cash From Mining Operations slide image

Generating Cash From Mining Operations

SHERBROOKE, QUÉBEC . • Hydro Power - 3 farms campus - Contracted • Operating 96 MW 90 MW - de la Pointe 12 MW -The Bunker 1, 2 & 3 42 MW - Leger 30 MW - Garlock 6 MW Nearing energization - The Bunker 3 +6 MW - Garlock +12 MW . • Retiring: - de la Point (-12 MW) 1 971 01010 LEGER THE BUNKER GARLOCK 1. de la Pointe reduced from 30 MW to 12 MW and is scheduled to be fully retired in December 2022 LOGICO Bitfarms 5
View entire presentation