© 2023 Chevron Gulf of Mexico projects Project Major capital projects Ownership Operator percentage Liquids capacity (MBD, 100%) Gas capacity (MMCFD, 100%) Start-up¹ Mad Dog 2 Other 15.6 140 Anchor 75 2023 Chevron 75.4 / 62.92 75 28 2024 St. Malo Stage 4 Waterflood Chevron 51 Maintain capacity Maintain capacity 2024 Whale Other 40 100 200 2024 Ballymore Chevron 60 863 613 2025 1 Projected start-up timing for non-operated projects per operator's estimate. 2 Represents 75.4% interest in the northern unit area and 62.9% interest in the southern unit area. 3 Blind Faith facility original capacity to be upgraded from 65MBPD and 45MMCFPD. Allocated design capacity for the Ballymore Project is 75MBPD of crude oil Chevron and 50MMCFD of natural gas. 18