Investor Update
Tsimiroro Field Planned 2011 FTG
Bemolanga
2010 survey
MADAGASCAR OIL
Full Tensor Gravity (FTG) - airborne gravimetric survey
Tsimiroro FTG survey purpose:
1. Tie Tsimiroro interpretation into 2010 Bemolanga
Survey.
Block 3102
2.
Provide detailed Tsimiroro tectonic analysis and
include all wells, ERT and seismic.
3.
Assist in interpretation of a thick (150 meters), oil
filled, Isalo reservoir identified in south Tsimiroro
field during 2010 drilling campaign.
1) Proposed Contingent 2011 FTG Survey (Blue area)
Will proceed based on approval of the Bemolanga FTG
program on 17 June 2011 :
3,500 km² coverage or 7,000 Line km.
Estimated budget: $1.3 million.
Proposed Contingent 2011 FTG Survey (Red area)
Will only proceed if Exploration FTG program is also
approved for Blocks 3105 and 3107:
Additional 2,500 km² coverage or 5,000 Line km
Additional budget: $900,000
Block 3104
2)
Block 3105
Block 3107
17 June 2011
Investor Update
12View entire presentation