Murphy West Uranium Project Overview slide image

Murphy West Uranium Project Overview

Cover Nabarlek Project: U40 Prospect - Infill and step out drilling next Dolerite Cahill Fm. 327,100mE U40 Prospect Section 8644750mN 137 136 1.8/0.08 18.4/ 0.05 5.5/0.12 168m 135 U40 Fault Zone 150m 120m 134 327,300mE RC135 3.1m @ 1.00% eU30, from 77.1m incl 1.4m @ 1.96% eU₂O 50m 138m -50m RC49 Drill Hole 23NBRC049 eU₂O ppm >1000 m/% eU₂O₂ eU O, gamma 50m 500 1000 100-500 50-100 Cover Dolerite Cahill Fm. Om 327,100mE 133 30m @0.06% eU₂O incl 0.6m @ 0.35% eU₂O U40 Prospect Section 8644700mN 132 93 92 91 327,300mE 90 RC132 40.7m @ 0.11% eU₂O, from 54.9m incl 2.6m @ 0.35% eU₂O, 0.4m @ 0.53% eU₁₂O, 0.6m @ 0.42% eU₂O 2.6/0.05 102m 102m 102m 3.2/0.12 108m -50m 150m RC49 Drill Hole 23NBRC049 eU₂O₂ ppm >1000 U40 Fault Zone m/% eU,O,* 500-1000 180m eUO, gamma 100-500 50m 50-100 Near surface uranium mineralisation at U40 masked by flat dolerite which requires further infill drilling DevEx successfully targeting significant uranium mineralisation along the U40 Fault south of previous high-grade intercepts • Major expansion to current drill campaign - Infill and Step-out south of these intercepts 12 0m 50m
View entire presentation