Investor Presentaiton
Potential Upside to Scoping Study
Scoping Study Key Metrics
Total Material Processed
3.9Mt @ 5.0g/t Au
1,400 mRL
1,300 mRL
PÅ
$
Potential Upside - Resource Stope Optimisation
Annual Payable Metal
71koz pa
1,200 mRL
1,1
OPEN
1,000 mRL
Plant Throughput
480ktpa
All-In Sustaining Cost
$1,538/oz
Pre-Production Capex
$99m
Notes
1. Refer to ASX Announcement 19 October 2022
900 mRL
800 mRL
700 mRL
600 mRL
500 mRL
400 mRL
6 835 069 mN
OPEN
OPEN
Natural Surface/Existing Pits
Planned Pits in SS
Mined Out
Indicated Stopes Included in SS
Inferred Stopes Included in 55
Indicated Stopes NOT Included in 55 (2.0 g/t Au Cut-off)
Inferred Stopes NOT Included in SS (2.0 g/t Au Cut-off)
6 834 697 mN
Processing Plant Layout
OPEN
Drill
g Extent
OPEN
6 834 325 mN
OPEN
OPEN
OPEN
6 833 953 mN
ROX
RESOURCES
16
SView entire presentation