Potential Upside to Scoping Study Scoping Study Key Metrics Total Material Processed 3.9Mt @ 5.0g/t Au 1,400 mRL 1,300 mRL PÅ $ Potential Upside - Resource Stope Optimisation Annual Payable Metal 71koz pa 1,200 mRL 1,1 OPEN 1,000 mRL Plant Throughput 480ktpa All-In Sustaining Cost $1,538/oz Pre-Production Capex $99m Notes 1. Refer to ASX Announcement 19 October 2022 900 mRL 800 mRL 700 mRL 600 mRL 500 mRL 400 mRL 6 835 069 mN OPEN OPEN Natural Surface/Existing Pits Planned Pits in SS Mined Out Indicated Stopes Included in SS Inferred Stopes Included in 55 Indicated Stopes NOT Included in 55 (2.0 g/t Au Cut-off) Inferred Stopes NOT Included in SS (2.0 g/t Au Cut-off) 6 834 697 mN Processing Plant Layout OPEN Drill g Extent OPEN 6 834 325 mN OPEN OPEN OPEN 6 833 953 mN ROX RESOURCES 16 S