FY22 Overview & Safety Program Update
PRODUCTION GUIDANCE
Aluminium (kt)
Nickel (kt)
1,190
1,269
982
992
20% growth in FY23 with
higher share of Mozal Aluminium and
restart of Brazil Aluminium smelter
41.7
43.5
43.5
34.1
FY21
FY22
FY23e
FY24e
FY21
FY22
FY23e
FY24e
Alumina (kt)
Manganese ore (Mwmt)
5,361
5,395
5,400
5.6
5.4
5.4
SA Mn guidance
for FY24
not provided
5,288
Both refineries expected to
sustain production above
nameplate capacity in FY23
3.4
FY21
FY22
FY23e
FY24e
Copper equivalent³¹ (kt)
30.6
89.0
Sierra Gorda
guidance for
FY24 not
provided
FY21
FY22
FY23e
FY24e
Zinc equivalent³² (kt)
239.0
236.1
233.4
224.2
FY21
FY22
FY23e
FY24e
Sierra Gorda expected to achieve
higher throughput, benefitting from
the de-bottlenecking project
Cannington expected to benefit from
the optimised mine configuration
accelerating access to higher-grade material
FY21
FY22
FY23e
FY24e
Cerro Matoso's plant availability
expected to return to normalised levels,
while the OSMOC project
mitigates natural grade decline
III
SOUTH32
Australia Manganese expected to increase
primary production while the PC02 circuit
operates above nameplate capacity
South Africa Manganese (SA Mn) will
continue to optimise volumes and
its use of higher cost trucking
Metallurgical and energy coal (Mt)
6.2
5.7
1.5
0.8
6.5
LLLI
FY21
FY22
4.6
0.9
0.7
FY23e
FY24e
Production expected to recover in FY23 with
fewer longwall moves and a recovery from wet
weather, subject to maintaining labour
productivity as we negotiate
Enterprise Agreements at Appin
Expected to decline to 5.3Mt in FY24 as
Dendrobium moves into a new mining area
Metallurgical coal
Energy coal
SLIDE 21View entire presentation