Investor Presentaiton
Bergers Revisited
-7,570,000mN
614,500mE
Encouraging, near-surface, first-pass lithium.
drilling intersections of 7m @ 0.84% Li₂O
(OMR032) and 3m @ 0.71% Li₂O
(OMR037) during the Phase 1 drilling
demanded follow up, with infill soil
sampling completed
■ Re-evaluation of Bergers has now identified
a strong, lithium-in-soil anomaly that forms a
prospective area some 700m long and
300m wide
■ Upcoming RAB drilling will test the extent of
this anomaly, with the aim of generating
deeper RC drill targets in 2024
OMR028
OMR017
OMR020
OMRO29 OMR019
OMR039
OMRO30 OMR027
OMRO26
OMR022
OMRO18
OMR031
7,589 500 N
7,569,000mN
614.500mE
Prospect Resources
615,000mE
615,500m
Bergers NE
Bergers Workings
OMR038
OMR037
615.000mE
OMRO3
OMR035
OMRO36
OMR032
Swakopmund
OMR033
RAB Drill Target Area
015 500me
Project
Location
Windhoek
Walvis Bay
NAMIBIA
Luderitz
7569,500mN-
200m
UTM WGS84 Zone 33S
Prospect Resources
Omaruru Lithium Project
Legend
Geochemical Soil
Sampling (West)
Pegmatite Contacts (approx.)
Lippm
300-999
-200-299
150-199
120-149
0
-75-119
Soil Geochemical Infill Grid for Bergers Central showing new drill target zone
Refer to ASX Announcements "Significant New Drill Targets identified at Omaruru" dated 15 November 2023
50-74
25-49
0-24
Existing Drill Holes
16View entire presentation