Investor Presentaiton
29
Q1 2022 Results
May 2022
ENGIE
Nuclear phase out in Belgium
Indicative theoretical total (Belgium + France) nuclear production
47.4 TWh
2021
c.44 TWh¹
2022
c.33 TWh¹
2023
c.32 TWh¹
2024
c.23 TWh¹
2025....
Operated
ENGIE
End of
capacity
capacity
operations /
Nuclear reactors
Operator @100% (MW)
(MW)
contracts
Doel 3
ENGIE
1,006
903
1-Oct-2022
Tihange 2
ENGIE
1,008
905
1-Feb-2023
Doel 1
ENGIE
445
445
15-Feb-2025
Doel 4
ENGIE
1,038
932
1-July-2025
Tihange 3
ENGIE
1,038
932
1-Sep-2025
Tihange 1
ENGIE
962
481
1-Oct-2025
Doel 2
ENGIE
445
445
1-Dec-2025
Chooz B (swap)
EDF
(100)
2025
Chooz B (drawing rights)²
EDF
750
2037
Tricastin (drawing rights)³
EDF
468
2031
TOTAL
6,161
1. Belgium + France. Indicative volumes @ ENGIE share assuming a theoretical 85% availability
2. Chooz: 750 MW * average availability of total EDF nuclear fleet in France (excl. Tricastin)
3. Tricastin: 468 MW * local availability of Tricastin units
c.9 TWh¹
2026View entire presentation