Investor Presentaiton slide image

Investor Presentaiton

Tumblegum South Prospect 2019 RC drilling - 16 holes for 1,582 metres completed BGRC033-4m @ 7.83 g/t Au and 0.23% Cu (119-123m), including 1 m @ 30.24 g/t Au and 0.39% Cu BGRC040-5 m @ 2.21 g/t Au and 0.16% Cu (92-97m) including 1 m @ 6.11 g/t Au and 0.28% Cu 663 000mE GRC09004 3m @ 6.0g/t Au, 0.61% Cu from 21m BGRC003 2m @4.19g/t Au, 1.38% Cu from 8m BGRC027 1m @6.71g/t Au from 24m 2m @ 2.88g/t Au from 33m [email protected]/t Au from 69m GRC1159 5m @ 9.64g/t Au, 0.18% Cu from 58m GRC1157 7 019 800mN 7019 850mN 7 019 900mN 7 019 950mN 7 020 000mN 7 020 050mN South North and 2m @ 4.19g/t Au surface blocked mullock dump shaft 2m @ 18.13g/t Au BGRC029 ind. 1m @ 32.18g/t Au, E51/843 10m @ 2.59g/t Au, 0.10% Cu from 33m 2m @ 2.03g/t Au, 0.32% Cu from 142m BGRC038 663 500mE Tumblegum Pit Cross Section B-B' 011 042 029 AZ 004 018 012 027 028 040 002 017 005 030 006 031 032 021 026 022033 023 013 σ Long 034 Section 008 A-A' 037 00 019 041 036 035 024 014 664 000mE ☑ 2019 drilling (prefix BGRC) 2017 drilling (prefix BGRC) 2013 drilling 2009 drilling Historic pit or shaft Thrust shears Structural interp. Exploration licence BGRC018 1m @ 4.37g/t Au, 0.74% Cu from 106m BGRC002 1m @ 3.17g/t Au, 3.98% Cu from 102m BGRC040 5m @2.21g/t Au, 0.16% Cu from 92m BGRC005 5m @ 3.56g/t Au, 0.55% Cu from 84m BGRC015 2m @ 18.13g/t Au, 0.36% Cu from 46m BGRC033 4m @ 7.83g/t Au, 0.23% Cu from 119m BGRC019 3m @ 0.85g/t Au from 60m and 2m @ 1.48g/t Au from 68m BGRC020 3m @ 3.53g/t Au, and 0.27% Cu from 74m 2m @ 1.24g/t Au from 85m 0.44% Cu 4m @ 0.92g/t Au 5m @ 3.56g/t Au BGRC022 ind. 1m @ 9.57g/t Au BGRC005 1m @ 3.40g/t Au BGRC040 BGRC003 O 3m @ 6.0g/t Au 0.61% Cu 1m @ 13.43g/t Au, 0.51% Cu from 108m 1m @ 1.35g/t Au (adjacent to stope) GRC9004 BGRC001 O 7019 800mN ? BGRC027 450mRL BGRC031 NE portion of E51/843 039 038 BGRC015 BGRC004 GRC1159 O BGRC008 1m @ 6.71g/t Au 7m @ 3.36g/t Au from 13m 2m @ 2.88g/t Au and 1m @ 3.11g/t Au 2m @ 3.70g/t Au from 31m and 5m @ 9.64g/t Au ind. 2m @ 22.20g/t Au BGRC032 BGRC002 4m @ 7.83g/t Au incl. 0.14% Cu (adjacent to stope) BGRC018 400mRL GRADE (gram x metre) BGRC028 1m @ 30.43g/t Au +40 and 0.39% Cu BGRC030 1m @ 4.37g/t Au 20-40 BGRC033 0.74% Cu 10-20 5-10 1-5 1m @ 3.17g/t Au 0-1 (adjacent to stope) open 5m @ 2.21g/t Au 350mRL ind. 1m @ 6.11g/t Au BGRC017 1m @ 1.18g/t Au 1m @ 4.21g/t Au from 45m and 0.81% Cu GRC1158 5m @8.2g/t Au, 3.05% Cu from 31m 2m @ 4.64g/t Au, 0.21% Cu from 162m BGRC009 7m @ 3.28g/t Au from 47m BGRC036 5m @ 3.81g/t Au, 0.28% Cu from 99m BRYAH RESOURCES LIMITED GABANINTHA PROJECT TUMBLEGUM SOUTH PROSPECT LONG SECTION A - A' looking West 50 metres [email protected]/t Au 0.76% Cu O Previous drilling -7019 200mN 2019 drill hole 250 metres Stope BRYAH RESOURCES LIMITED TUMBLEGUM SOUTH PROSPECT DRILL HOLE LOCATION PLAN (overlain on magnetics)
View entire presentation