Investor Presentaiton
Tumblegum South Prospect
2019 RC drilling - 16 holes for 1,582 metres completed
BGRC033-4m @ 7.83 g/t Au and 0.23% Cu (119-123m),
including 1 m @ 30.24 g/t Au and 0.39% Cu
BGRC040-5 m @ 2.21 g/t Au and 0.16% Cu (92-97m)
including 1 m @ 6.11 g/t Au and 0.28% Cu
663 000mE
GRC09004
3m @ 6.0g/t Au,
0.61% Cu from 21m
BGRC003
2m @4.19g/t Au,
1.38% Cu from 8m
BGRC027
1m @6.71g/t Au from 24m
2m @ 2.88g/t Au from 33m
[email protected]/t Au from 69m
GRC1159
5m @ 9.64g/t Au,
0.18% Cu from 58m
GRC1157
7 019 800mN
7019 850mN
7 019 900mN
7 019 950mN
7 020 000mN
7 020 050mN
South
North
and
2m @ 4.19g/t Au
surface
blocked mullock dump
shaft
2m @ 18.13g/t Au
BGRC029
ind.
1m @ 32.18g/t Au,
E51/843
10m @ 2.59g/t Au,
0.10% Cu from 33m
2m @ 2.03g/t Au,
0.32% Cu from 142m
BGRC038
663 500mE
Tumblegum Pit
Cross
Section
B-B'
011
042 029
AZ
004 018
012
027
028
040 002
017
005 030
006
031
032
021
026
022033
023
013
σ
Long
034
Section
008
A-A'
037
00
019
041
036
035
024
014
664 000mE
☑
2019 drilling
(prefix BGRC)
2017 drilling
(prefix BGRC)
2013 drilling
2009 drilling
Historic pit or shaft
Thrust shears
Structural interp.
Exploration licence
BGRC018
1m @ 4.37g/t Au,
0.74% Cu from 106m
BGRC002
1m @ 3.17g/t Au,
3.98% Cu from 102m
BGRC040
5m @2.21g/t Au,
0.16% Cu from 92m
BGRC005
5m @ 3.56g/t Au,
0.55% Cu from 84m
BGRC015
2m @ 18.13g/t Au,
0.36% Cu from 46m
BGRC033
4m @ 7.83g/t Au,
0.23% Cu from 119m
BGRC019
3m @ 0.85g/t Au from 60m
and
2m @ 1.48g/t Au from 68m
BGRC020
3m @ 3.53g/t Au,
and
0.27% Cu from 74m
2m @ 1.24g/t Au from 85m
0.44% Cu
4m @ 0.92g/t Au
5m @ 3.56g/t Au
BGRC022
ind.
1m @ 9.57g/t Au
BGRC005
1m @ 3.40g/t Au
BGRC040
BGRC003 O
3m @ 6.0g/t Au
0.61% Cu
1m @ 13.43g/t Au,
0.51% Cu from 108m
1m @ 1.35g/t Au
(adjacent to stope)
GRC9004
BGRC001 O
7019 800mN
?
BGRC027
450mRL
BGRC031
NE portion of
E51/843
039
038
BGRC015
BGRC004
GRC1159 O
BGRC008
1m @ 6.71g/t Au
7m @ 3.36g/t Au from 13m
2m @ 2.88g/t Au
and
1m @ 3.11g/t Au
2m @ 3.70g/t Au from 31m
and
5m @ 9.64g/t Au
ind.
2m @ 22.20g/t Au
BGRC032
BGRC002
4m @ 7.83g/t Au
incl.
0.14% Cu
(adjacent to stope)
BGRC018
400mRL
GRADE
(gram x metre)
BGRC028
1m @ 30.43g/t Au
+40
and
0.39% Cu
BGRC030
1m @ 4.37g/t Au
20-40
BGRC033
0.74% Cu
10-20
5-10
1-5
1m @ 3.17g/t Au
0-1
(adjacent to stope)
open
5m @ 2.21g/t Au
350mRL
ind.
1m @ 6.11g/t Au
BGRC017
1m @ 1.18g/t Au
1m @ 4.21g/t Au from 45m
and
0.81% Cu
GRC1158
5m @8.2g/t Au,
3.05% Cu from 31m
2m @ 4.64g/t Au,
0.21% Cu from 162m
BGRC009
7m @ 3.28g/t Au from 47m
BGRC036
5m @ 3.81g/t Au,
0.28% Cu from 99m
BRYAH RESOURCES
LIMITED
GABANINTHA PROJECT
TUMBLEGUM SOUTH PROSPECT
LONG SECTION A - A'
looking West
50 metres
[email protected]/t Au
0.76% Cu
O Previous drilling
-7019 200mN
2019 drill hole
250 metres
Stope
BRYAH RESOURCES
LIMITED
TUMBLEGUM SOUTH
PROSPECT
DRILL HOLE LOCATION PLAN
(overlain on magnetics)View entire presentation