OPERATIONAL PERFORMANCE BY ASSET
TAILINGS OPERATIONS
ELIKHULU
•
Production 8.3%
to 26,8630z (2019: 29,3010z) - AISC of
US$737/oz (2019: US$708/oz)
Lower recoveries and constrained plant throughput to be
resolved during H2FY21
9,975MW solar photovoltaic renewable energy power plant on
track for calendar Q3 commissioning - ensures a reliable
power supply and reduced electricity costs
Ounces production per year
Adjusted EBITDA generated: ZAR484,8million (US$29,8million)
Evander 7
Evander 7A
Year 4 mining
Year 2 mining
Year 3 mining
Year 6 mining
Year 5 mining
Pump
Year 4 mining
Year 7 mining
Year 5 mining
station
Approximately 6 km of
piping to be established
Leslie/Bracken
re-mining
Process water dam
Elikhulu LOM production profile
80 000
70 000
Actual
Forecast
60 000
50 000
40 000
30 000
20 000
10 000
0
Year 2 mining
Year 1 mining
Elikhulu TSF
All Elikhulu tailings
deposited onto the
combined Elikhulu
and Kinross TSF's
Elikhulu metallurgical
plant
Kinross
re-mining
Approximately 5.5 km of
piping to be established
Pump
station
Year 7 mining
Year 8 mining
Year 9 mining
Winkelhaak
re-mining
Year 10 mining
Year 11 mining
Year 12 mining
Switch to Winkelhaak TSF