Investor Presentaiton slide image

Investor Presentaiton

U.S. ARMY TENTATIVELY SELECTED PLAN EP 1105-2-58: "The least-cost alternative plan is considered to be justified if the total cost of the proposed alternative is less than the costs to relocate the threatened facility." TSP Identified: TRIBAR REVETMENT (Alternative 2) Estimated Construction Cost: $8.2M ➤ Less than the cost of facility relocation ($91M) - Supported by the Non-Federal Sponsor - Meets Project Design Requirements · Environmentally acceptable - Estimated Construction Time: 12-18 months 17