NHPC Renewable Energy and Pump Storage Project Updates slide image

NHPC Renewable Energy and Pump Storage Project Updates

New Initiatives Pump Storage Project Scheme (4) Odisha S.No Name/Place of PSP 1 Self Identification Installed Capacity (MW) 2000 28 एनएचपीसी NHPC Present Status MoU has been signed between NHPC Limited and Govt. of Odisha through GRIDCO Limited for "Development of Pumped Storage Projects (PSPs) in the State of Odisha" on 23rd June 2023. The MOU envisages setting up of at least 2000 MW PSPs in self- identified potential sites and Renewable Energy projects of 1000 MW or above in the State of Odisha. Total (5) Gujarat 2000 Name/Place of PSP Installed Capacity (MW) S.No 1 07 nos. identified pumped storage schemes in Gujarat 4000 Present Status NHPC is under discussion with Government of Gujarat for development of 07 nos. Pumped Storage Projects aggregating to 4000 MW. In this regard NHPC has prepared evaluation report and submitted to Govt. of Gujarat on 31.05.2023. ➤ An draft MOU is proposed to be signed between NHPC and Govt. of Gujarat for development of PSPs in the State of Gujarat has been submitted by NHPC for consideration and acceptance. Total 4000
View entire presentation