NHPC Renewable Energy and Pump Storage Project Updates
New Initiatives
Pump Storage Project Scheme
(4) Odisha
S.No
Name/Place of PSP
1
Self Identification
Installed Capacity (MW)
2000
28
एनएचपीसी
NHPC
Present Status
MoU has been signed between NHPC Limited and Govt. of
Odisha through GRIDCO Limited for "Development of Pumped
Storage Projects (PSPs) in the State of Odisha" on 23rd June 2023.
The MOU envisages setting up of at least 2000 MW PSPs in self-
identified potential sites and Renewable Energy projects of 1000
MW or above in the State of Odisha.
Total
(5) Gujarat
2000
Name/Place of PSP Installed Capacity (MW)
S.No
1
07 nos. identified
pumped storage
schemes in Gujarat
4000
Present Status
NHPC is under discussion with Government of Gujarat for
development of 07 nos. Pumped Storage Projects aggregating to
4000 MW. In this regard NHPC has prepared evaluation report and
submitted to Govt. of Gujarat on 31.05.2023.
➤ An draft MOU is proposed to be signed between NHPC and Govt. of
Gujarat for development of PSPs in the State of Gujarat has been
submitted by NHPC for consideration and acceptance.
Total
4000View entire presentation