NHPC - Projects in Operation... contd. Renewable Energy एनएचपीसी NHPC 27 S.No Project Installed Design Capacity Energy Capital Cost Year of Comm. as on (MW) (MU) 31.03.2022 Tariff 21-22 (Rs./unit) Place of Project Wind Power 50 94.22 2016 330.40 3.67 Lakhmana, Jaisalmer 2 Solar Power 50 105.95 2018 290.59 4.41 Theni/Dindigul District, Tamilnadu Total-B 100 200.17 620.99 5551 Sub Total Stand-alone(A+B) 24801.55 40837.69 3.35 Operational Projects with Subsidiary Installed S.No Project Capacity Design Energy Year of Comm. Capital Cost Tariff 18-19 (Rs./kwh)* Type of the project (MW) (MU) 1 Indrasagar, (8x125) 1000 1423.26 2005 5122.76 3.67 Storage Madhya Pradesh 2 Omkareshwar, 520 736.45 2007 3088.38 4.55 Storage (8x65) Madhya Pradesh Total-C 1520 2159.71 8211.14 3.97 *Tariff for 2019-20, 2020-21 and 2021-22 yet to be notified. Grand Total- 7071 26961.26 D:(A+B+C)