OUR ALUMINIUM VALUE CHAIN BUSINESS
We have leading integrated positions in the aluminium value chain
SOUTH32
An integrated chain
producing low-carbon
aluminium in Brazil
MRN (33%)
Bauxite
BRAZIL ALUMINA (36%)
Alumina
+--------
Merchant
market
BRAZIL ALUMINIUM (40%)
Aluminium
HILLSIDE ALUMINIUM (100%)
Aluminium
Two integrated
bauxite and
alumina refineries
producing ~5.4Mt(a)
MOZAL ALUMINIUM (63.7%)
Aluminium
Merchant
Alumina supply to
our smelters
Jay ---
WORSLEY ALUMINA (86%).
Alumina
~2.4Mt of alumina
directed to our
smelters (S32 share)
producing
~1.2Mt aluminium (a)
~3.0Mt of alumina
directed to the
Atlantic and Pacific
merchant markets(a)
Bauxite and Alumina
•
We are investing to further enhance our low-cost, integrated bauxite mines
and alumina refineries 11
Feasibility study commenced for the West Zone project at the
MRN bauxite mine, with the potential to extend mine life by
more than 20 years (b)(c)
Executing decarbonisation and energy security projects at
Worsley Alumina, with the first coal to gas boiler conversion
on-track for mid CY23
De-bottlenecking Phase Two project at Brazil Alumina is expected to
lift capacity by 4% from H1 FY26
Aluminium
Our recent investments in Mozal Aluminium 12 and Brazil Aluminium 13
have increased our low-carbon aluminium capacity >100%
Mozal Aluminium is delivering its recovery plan to schedule,
with full production expected to be restored in Q1 FY24
Brazil Aluminium is on-track to deliver nameplate capacity in FY24,
with our share of production expected to increase ~100% to 148kt
Notes:
a.
b.
C.
Based on FY24e production guidance.
There is low level of geological confidence associated with the Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the Production Target will be realised. The stated Production Target is based on South32's current expectations of future results or events and should not be solely
relied upon by investors when making investment decisions. Further evaluation work and appropriate studies are required to establish sufficient confidence that this target will be met.
Refer to important notices (slide 2) for additional disclosure.
SLIDE 14View entire presentation