Investor Presentaiton slide image

Investor Presentaiton

State of TEPCO Fukushima Daiichi NPS (FDNPS) Spent fuel removal For Unit 3, fuel removal was completed on 2021/2/28. - For Unit 1 and 2, preparation works (rubble removal or installation of cover etc.) are ongoing. ā—† Fuel debris retrieval - Trial retrieval will start from Unit 2. - The equipment for retrieval arrived in Japan on 2021/7/10, and transferred to Fukushima on 2022/1/31. Unit 1 Hydrogen explosion Spent fuel pool Hydrogen Unit 2 Unit 3 explosion Front chamber Removed fuel assemblies Roof dome 566/566 (Completed 2021/2/28) Fuel handling Machine crane Hydrogen[ Unit 4 explosion Cover for fuel retrievall Removed fuel assemblies 1535/1535 (Completed 2014/12/22) Water injection 392 Water injection Core melt Fuel debris Core melt 000 615 Water injection Core melt 000 000 Unit 3,4 Storage/Tra nsportation Storage/ Transportation Units 1 and 2 Removing fuel from the Spent Fuel Pool Installation of fuel removal Rubble removal Fuel removal equipment Units 1, 3 Unit 2 Current progress Fuel debris retrieval Ascertaining of the situation inside the PCV/ consideration of fuel debris retrieval etc Fuel debris retrieval Disassembly of reactor facility, etc Extended to 30-40 years Consideration of scenario and technologies Design and construction of equipment Dismantling and other tasks 7
View entire presentation