The CCLEX bridge (Cebu - Cordova) is the highest (145 meters) and the longest (8.9 km) in the Philippines. The construction of the bridge required 165,000 m³ of concrete for the in-situ poured elements and the precast segments. Thanks to its expertise and its large range of technologies, Chryso developed a unique and tailor-made superplasticizer to meet the needs of the worksite, while optimizing the concrete mix design with locally available resources. PHILIPPINES CHRYSO SAINT-GOBAIN 2022/2023 INTEGRATED ANNUAL REPORT ⚫ SAINT-GOBAIN ⚫ 3