Investor Presentaiton
HORIZONTE
MINERALS
-9116500 mN
Pequizeiro Target
Continuity of mineralisation at the Peqizerio Target
20.1 10.34
Pequizeiro Sector
Drilling May 2011
Thickness (m)
1.0% Ni COG
62 8 32 20
15.77 17.32 5304 20.9 19.90 2.78 10.71
D
3.06
344 21.3 17 28 9.4 18.57 801
195
0290 5.45 11.78 15.80 11.02 14 10 36 15.02 25 10
-9116000 mN
12.85
W
E
4.6 2.13 55 11 91 14.73 15
10.5 14 67 20
4175
D
4.25 9 82 16.39-17.75
10 48
16.39
7.67
3.28
4.2 2.03
21.61
17
16.21 36
10.5
9.15
3 58
8.99 3.03 16.02 10.85 22 27 10.66
14.63
38-5.56 17 29 18 11-13 78-12.73
21.19
5.06 13.10 11.84 18.62 10.82 11.11 10.57 13.32 5.04 2.63
O
10.6
3.36
0 10 66 14.5 12 12 10.57 7 37 79
3.58 22
-9115500 mN
-9115000 mN
2.0m minimum intersect
2.0m maximum internal waste
0
500m
Developing the next major nickel project in Brazil
0.41 14 59 18.98 14 34 12.53 13 15 53 6.44
2.01
94
267
3.91
447
AIM: HZM TSX: HZM
13View entire presentation