Varanus Island and associated gas fields Santos operated 100% + Varanus Island facilities + + Nameplate capacity 390 TJ/day Two low temperature separation gas plants (3 trains) CO₂ remove plant (2 trains) + + Two 39,750KL crude oil storage tanks + + + Crude oil export pipeline and marine load-out terminal Two sales gas pipelines to the mainland metering station Camp and mess facilities (150 person capacity) Western Australia & Northern Territory Site Visit 2019 Santos 30