2021-2023 Sustainability Plan and Financial Performance slide image

2021-2023 Sustainability Plan and Financial Performance

Pipeline enhances visibility on 2021-23 target (and beyond) and ringfences returns enel Renewables Pipeline (GW) Mature pipeline by geo 2021-23 Additional capacity target 19.5 GW 33% ~305 -40 ~179 Residual target² 6.3 GW 24% ~73 GW Pipeline 3.6x Coverage Ratio³ 29% 14% +29 GW vs PY -73 ~12 Europe Latin America North America ROW Gross Pipeline BESS¹ Early stage Mature In execution 1. It includes storage for around 32 GW in early stage and around 8 in mature pipeline 2. It includes capacity in execution and built 3. Calculated using 2021-23 mature pipeline 127
View entire presentation