Consolidated Backlog Breakdown - 31 December 2021 USA 22.0% Backlog by Geography Other 3.8% Commercial 29.9% Backlog by Sector Saudi Arabia 3.2% Private 28.6% Backlog by Client Egypt 71.0% Industrial 16.0% Public 71.4% EGP 41.6% Backlog by Currency (1) Infrastructure 54.1% FCY & FCY- priced 58.4% ORASCOM CONSTRUCTION (1)41% of backlog in Egypt is in FCY. The Group incorporates cost escalation clauses in most EGP contracts to protect against potential cost inflationary pressures Note: Backlog breakdown as of 31 December 2021; backlog excludes BESIX and JV's accounted for under the equity method 5