Investor Presentaiton
SOUTHERN PROJECT AREA
GILMOUR RESOURCE
-
258,000oz
Resource of 2.6 Mt at 3.09 g/t Au for 258,400 oz (100% Gold Road)
Open pit: 129,100 oz at 2.21 g/t Au
Underground: 129,300 oz at 5.13 g/t Au
Indicated: 120,000 oz at 5.2 g/t Au (46%)
Initial metallurgical test-work
SE
500 mRL
6,864,800 mN
2 m at 74.98 g/t Au
400 mRL
November 2019 MR
Stope Outlines - A$1,850
6,865,000 mN
20WDDD00048
6.25 m at 1.15 g/t Au &
1.70 m at 4.13 g/t Au
folded veins
• 89-90% overall recovery
28-82% gravity recovery
Development Alternatives
300 mRL
1 m at 31.98 g/t Au
200 MRL
100 mRL
■
Potentially part of future standalone operation
0 MRL
■
Alternative is to toll treat - 55 km from Gruyere
GOLD
ROAD
Note: Refer to ASX announcement dated 4 December 2019
RESOURCES
Milestone 4
Pink Fault
A
0.97 m at 38.52 g/t Au
6,865,200 mN
6,865,400 mN
NW
(330°)
5 m at 8.42 g/t Au
November 2019 MR
Pit Shell A$1,850
0.62 m at 73.03 g/t Au
Host Rock
Toppin Hill Mid Conglomerate
400 m
Note: Refer to ASX announcement dated 4 December 2019 and 10 September 2020
19WDRC0242
Cover
6.78 at 5.33 g/t Au
folded veins.
Bedrock
4.00 m at 16.58 g/t Au
Bedrock
Main Lode
Potential
Extension
to Existing
(true width 2.0m)
Bedrock
Fresh Bedrock
MR
Waters Fault
19WDRC0241
2.20 at 2.51 g/t Au
Main Lode
(true width 1.25m)
Au g/t
-
<0.01
0.01 0.3
0.3-1.0
1.0-2.0
2.0-3.5
3.5-5.0
5.0-10.0
10.0 30.0
30.0+
Hole Type
RC
Diamond
Resource Category
Measured
Indicated
Inferred
Unclassified
MR Mineral Resource
OR Ore Reserve
PAGE | 19View entire presentation