Investor Presentaiton slide image

Investor Presentaiton

SOUTHERN PROJECT AREA GILMOUR RESOURCE - 258,000oz Resource of 2.6 Mt at 3.09 g/t Au for 258,400 oz (100% Gold Road) Open pit: 129,100 oz at 2.21 g/t Au Underground: 129,300 oz at 5.13 g/t Au Indicated: 120,000 oz at 5.2 g/t Au (46%) Initial metallurgical test-work SE 500 mRL 6,864,800 mN 2 m at 74.98 g/t Au 400 mRL November 2019 MR Stope Outlines - A$1,850 6,865,000 mN 20WDDD00048 6.25 m at 1.15 g/t Au & 1.70 m at 4.13 g/t Au folded veins • 89-90% overall recovery 28-82% gravity recovery Development Alternatives 300 mRL 1 m at 31.98 g/t Au 200 MRL 100 mRL ■ Potentially part of future standalone operation 0 MRL ■ Alternative is to toll treat - 55 km from Gruyere GOLD ROAD Note: Refer to ASX announcement dated 4 December 2019 RESOURCES Milestone 4 Pink Fault A 0.97 m at 38.52 g/t Au 6,865,200 mN 6,865,400 mN NW (330°) 5 m at 8.42 g/t Au November 2019 MR Pit Shell A$1,850 0.62 m at 73.03 g/t Au Host Rock Toppin Hill Mid Conglomerate 400 m Note: Refer to ASX announcement dated 4 December 2019 and 10 September 2020 19WDRC0242 Cover 6.78 at 5.33 g/t Au folded veins. Bedrock 4.00 m at 16.58 g/t Au Bedrock Main Lode Potential Extension to Existing (true width 2.0m) Bedrock Fresh Bedrock MR Waters Fault 19WDRC0241 2.20 at 2.51 g/t Au Main Lode (true width 1.25m) Au g/t - <0.01 0.01 0.3 0.3-1.0 1.0-2.0 2.0-3.5 3.5-5.0 5.0-10.0 10.0 30.0 30.0+ Hole Type RC Diamond Resource Category Measured Indicated Inferred Unclassified MR Mineral Resource OR Ore Reserve PAGE | 19
View entire presentation