Investor Presentaiton slide image

Investor Presentaiton

Renewable energy business - pipeline projects 172MW power plants are under advanced stage of development Renewable energy Tbilisi WPP + Kaspi WPP Darchi HPP Zoti HPP Installed capacity (MW) 54.0 54.0 17.5 46.0 Generation (P501, GWh) 175 174 85 173 Capacity factor 37% 37% 55% 43% Target commissioning date 2H23 2H23 1H23 2H22 Target ROIC 11.0% 11.0% 13.2% 10.5% Total installed capacity 172MW Total annual generation (P50) 607GWh Note (1): P50 figure is the annual average level of generation, where the output is forecasted to be exceeded 50% over a year 11