Investor Presentaiton slide image

Investor Presentaiton

ANNUAL REPORT P Private Power and Infrastructure Board Year-wise Planned Additions by PPIB (2020-2028) (Hydropower Projects) To be advertised 1,260 MW COD will be assessed after issuance of LOI. Not likely to achieve COD before 2028 2028 1,172 MW 2021 727 MW 2022 884 MW ANNUAL REPORT Private Power and Infrastructure Board In order to optimize hydropower generation in the country, Private Power and Infrastructure Board is planning to invite Expressions of Interest through International Competitive Bidding from prospective investors for development, financing, construction and operations of following hydropower projects in the private sector. These projects will be offered to potential investors in accordance with the relevant provisions of applicable Policies subject to verification of demand supply situation by the Government which is being carried out on annual basis under IGECP framework: a) b) 548 MW Kaigah Hydropower Project Proposed to be developed on Indus River, Khyber Pakhtunkhwa 500 MW Chakothi-Hattian Hydropower Project - Proposed to be developed on Jhelum River, Hattian, AJ&K. 2024 8 MW c) 132 MW Rajdhani Hydropower Project - Proposed to be developed on Poonch River, AJ&K 2026 2,124 MW Current status as well as future targets/plans of PPIB for implementing hydropower projects is appended in the following image: Current Status of Ongoing Under Hydropower IPPS evaluation 300 MW (5%) Under Construction 1604 MW (26%) Under FC 1839 MW (29%) To be advertised 1260 MW (20%) Under LOS 1172 MW (20%) d) 80 MW Neckeherdim-Paur Hydropower Project - Proposed to be developed on Yarkun River, Chitral Valley, KP For maximizing hydropower generation, PPIB has been assigned another important task of implementing Small Hydropower Projects (SHPPS) being indigenous, renewable and economical resource up to the capacity of 50 MW. The Board of PPIB in its 122nd meeting held on 19th February 2019 approved processing of SHPPs initiated by the Provincial / AJ&K governments for issuance of Tripartite LOS (TLOS) under the Power Policy 2015. It was inter-alia decided by the Board that small hydropower projects already initiated by provinces / AJ&K will be further processed under 2015 Policy and the TLOS will be issued by PPIB after fulfilment of pre-requisites as per 2015 Policy and achievement of three major milestones; including tariff determination / approval by NEPRA (in case the same is more than one year old, a fresh tariff from NEPRA would be required), NOC for power evacuation and grid interconnection from NTDC and / or relevant DISCO, and CPPAG-L's consent for purchase of power. In this regard, Board of PPIB in its 123rd meeting held on 6th May 2019 approved issuance of TLOS to initially following two SHPPS which fulfill the above criteria: 7.08 MW Riali-ll Hydropower Project located on Ghori Wala Nullah, Muzaffarabad AJ&K 8 MW Katahi-Il Hydropower Project located on Kathai Nullah, Hattian, AJ&K Kathai Project 115 116
View entire presentation