Renewable Energy B. Subsidiary/JV Mode (b) Under Pipeline एनएचपीसी 23 NHPC S.No Name of Project Capacity (MW) Estimated Expected Commissioning Capital cost Tentative Tariff (Rs./unit) Schedule 1 Floating Solar Project, Odisha 300 2000.00 2024-25 3.98 (Proposed JV between NHPC (74%) & GEDCOL (26%) 2 Solar Park, Jalaun (U.P.) 1200 840.00 2024-25 under UMREPP To be discovered Status of PPA To be explored by JVC with State Discom To be explored subsequently (Subsidiary -BSUL) Total- (b) 1500 2840.00 Grand Total-B:(a+b) 1653 3741.16