Investor Presentaiton slide image

Investor Presentaiton

Mt Charlotte Planned 32 Level Drilling, Mt Charlotte 246m @2.5g/t including: 14m @4.6g/t 22m @2.3g/t' NOB MOBAY ROB COB 19m @ 3.5g/t Planned Drilling COB 32 Leveli -1000mRL 302m @ 2.2g/t including: 16m @ 3.1g/t 32m @ 5.1g/t 4m @ 13.0g/t Untested ------- CHARLOTTE FAULT Planned Drilling | Planned Drilling Planned Drilling NWOODES OPEN ROB MOB NORTHERN STAR Mt Charlotte RD NELSON FAULT -- Sam Pearce Decline Untested NORTHERN STAR RESOURCES LIMITED ■ 3km north of the Fimiston processing plant Significant potential to expand multiple areas adjacent to existing mine infrastructure LEGEND Drilling 0-0.5g/t 0.5-0.8g/t 0.8-1.2g/t. 1.2-2.0g/t " 2.0-3.5g/t 3.5-5.0g/t 5.0-20.0g/t 20.0 100.0g/t +100.0g/t Mined -1000mRL- 500m ■ 28% increase in Ore Reserves to 1.2Moz, after depletion ■ Future extensional drilling to significantly expand the down-plunge position of the main Charlotte orebody Plans to increase drilling fleet " Untested Long Section 0 6
View entire presentation