Investor Presentaiton
Mt Charlotte
Planned 32 Level Drilling, Mt Charlotte
246m @2.5g/t
including:
14m @4.6g/t
22m @2.3g/t'
NOB
MOBAY
ROB
COB
19m @ 3.5g/t
Planned
Drilling
COB
32 Leveli
-1000mRL
302m @ 2.2g/t
including:
16m @ 3.1g/t
32m @ 5.1g/t
4m @ 13.0g/t
Untested
-------
CHARLOTTE FAULT
Planned Drilling |
Planned Drilling
Planned Drilling
NWOODES
OPEN
ROB
MOB
NORTHERN STAR
Mt Charlotte
RD NELSON FAULT
--
Sam Pearce Decline
Untested
NORTHERN STAR
RESOURCES LIMITED
■ 3km north of the Fimiston processing plant
Significant potential to expand multiple areas
adjacent to existing mine infrastructure
LEGEND
Drilling
0-0.5g/t
0.5-0.8g/t
0.8-1.2g/t.
1.2-2.0g/t
"
2.0-3.5g/t
3.5-5.0g/t
5.0-20.0g/t
20.0 100.0g/t
+100.0g/t
Mined
-1000mRL-
500m
■ 28% increase in Ore Reserves to 1.2Moz, after
depletion
■ Future extensional drilling to significantly
expand the down-plunge position of the main
Charlotte orebody
Plans to increase drilling fleet
"
Untested
Long Section
0
6View entire presentation