ADB-PLN Electrical Grid Strengthening Program slide image

ADB-PLN Electrical Grid Strengthening Program

Java-Bali 500 kV Power Transmission Crossing Financing Project Cost: $249 million) $20.84 million ADB (including $2.08 million co-financing from AIF), plus parallel co-financing from KfW Approval: 3 Dec 2013 Transmission of power from East Java to Bali at 500 kV optimal solution to improve the power supply in Bali based on least-cost power system studies. Coupling Bali with more efficient generation capacity in Java, transmitting power from Java would be a more technically and economically feasible option before installing new generation plants in Bali given demand growth in Bali. • • SCOPE Extension/upgrading of 11 existing SS New 500/150 kV SS - cancelled • 500 kV TL crossing the Bali Strait (KfW and PLN) with a total transmission capacity of 3,600 megavolt-amperes (MVA) with power capacity of 3,000 MW - cancelled yeman Kraksaan Probolinggo Component 1. Paiton 500 kV SS extension (ADB) Lumajang Tempeh Kunir Date 23rd Feb 2021 Nusa Barung Paiton Besuki Situbondo Component 2. 500kV Paiton to Watudodol TL, 131 km (ADB) Leung Component 3. 500 kV OHL Bali Strait crossing, 4km (KfW) Gn. Raung Jember Genteng Watudodol Segara Rupek Kalipuro Banyuwangi Component 4. 500 kV Segara Rupek to Gilimanuk TL, 10km (PLN) Gilimanuk Negara Taman Nasional Meru Betiri Kesilir Gradjagan SINGARAJA Component 5. 500kV Gilimanuk to New Kapal TL, 75 km (ADB) Pulu Antosari Component 6. Antosari 500/150 kV new SS (ADB) BALI ADB 5
View entire presentation