Drilling Programme Conclusions The drill hole defined the southern part of the limestone and shale deposits sufficient enough to support large scale cement / clinker project. If required further drilling could be done in the northern part of the EPL covering farm Totem 92; āœ“ The ten boreholes drilled on farm Kaalberg 93 were widely spaced and will require infill and possibly deeper drilling in order to properly quantify the tonnage of limestone in the area as part of the full Bankable Feasibility Study (BFS) to be implemented; CEGEOR CC