Investor Presentaiton slide image

Investor Presentaiton

GRUYERE UNLOCKING QUALITY Simple Open Pit Mining ■ Low strip ratio of 2.7:1 STAGE 1* Q4 2018 Q1 2021 DEPLETION TO EOY 2019 Waste (Mt) 17.4 2019 Mined 2019 2019 STAGE 3 Processed ROM Stocks Ore (Mt) 14.9 Q2 2020 Q2 2025 Waste (Mt) 6.9 Grade (g/t) 1.06 Ore (Mt) 6.7 3.3 3.4 Contained Au (Moz) 0.51 Waste (Mt) 49.3 Grade (g/t) 0.87 1.05 0.7 Strip Ratio (W:O) 1.17 Ore (Mt) 15.8 Contained Au (Moz) 0.19 0.11 0.08 Grade (g/t) 1.32 *Un-depleted - Refer to Depletion to EOY2019 Contained Au (Moz) 0.67 Strip Ratio (W:O) 3.13 ■ ~ 9,250 oz per vertical metre Simple Processing ■ Gravity CIL processing circuit ■ Overall recovery 91-94% STAGE 2 Q1 2020 Q3 2023 ◉ Gravity recovery 35-40% Waste (Mt) 30.2 Ore (Mt) 18.4 Grade (g/t) 1.14 Contained Au (Moz) 0.68 Strip Ratio (W:O) 1.64 Mining Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 2020 2021 2022 2023 2024 STAGE 4 Q1 2022 - Q4 2026 Waste (Mt). 69.7 Ore (Mt) 14.4 Grade (g/t) 1.12 Contained Au (Moz). 0.52 Strip Ratio (W:O) 4.83 900m 385m 1,830m STAGE 5 Q1 2023 Q3 2029 Waste (Mt) 85.7 Ore (Mt) 26.7 Grade (g/t) 1.34 Contained Au (Moz) 1.15 Strip Ratio (W:O) 3.21 GRUYERE PIT STAGES PAGE | 8
View entire presentation