Clear delivery pathway
Permitting process benefits from 'one-stop shop' authority for each phase
SOUTHHARZ
POTASH
Phase
Step 1: Site
approval
Regional and
Spatial Planning
Procedure
Step 2: Build
approval
Planning Approval
Procedure
Step 3: Operating
approval
Approval of Main
Operating Plan
Step 4: Special
approval
Approval of Special
Operating Plan
Detail and authority
"
"
"
Determines whether project can be implemented in a spatially, socially and environmentally compatible manner at the planned location
Applies for projects with significant impact on development of a state or region measured by its effect on environment, supply of public goods, traffic, plus economic and social goals of
state development plan
Assesses and determines the feasibility of the project in a broader scope at an early planning stage
A formal EIA is required
Approval authority is Thüringer Landesverwaltungsamt (TLVWA)
Scoping Paper submitted ahead of full Spatial Planning application by September, with brownfield at Bernterode and greenfield at Haynrode contemplated ✓
Covers all mandatory regulatory processes and permits for General Operating Plan
Includes all approvals and permits by the competent authorities to construct a mine and related facilities, except for certain water law permits
A typical operator regards a Step 2 approval which has become final as a sufficient basis for a project FID
Requires an EIA to be submitted as part of a General Operating Plan
Plan submitted for the purpose of carrying out a public consultation procedure with authorities other than the TLUBN, municipalities, the public and environmental organisations
Approval authority is the Thüringer Landesamt für Umwelt, Bergbau und Naturschutz (TLUBN)
Approval leads to a Planning Approval Decision
Mandatory to operate plants and facilities in the mining area
Mining authority has no discretion regarding approval of initial and subsequent Main Operating Plans (and Special Operating Plans); if fulfilling the statutory requirements and in-line with
the Step 2 approval, then the Step 3 approval must be granted
Includes submission of Main Operating Plan, renewable every two years
Based on same information as submitted under Step 2 above and includes technical concept, detailed safety measures and hazard prevention for operation of mines and facilities
Approval authority is TLUBN
Approval leads to an Operating Plan Permit
Special Operating Plans provide the operator greater flexibility in separating certain installations and activities from the Main Operation Plan. Such plans do not have to be renewed every
two years
Approval process includes submission of a Special Operating Plan for specific installations or activities
Based on same information as submitted under Steps 2/3 above, with more detailed technical specification
Approval authority is TLUBN
Approval leads to a Special Operating Plan Permit