Copperstone Project Pitch
A
2018 Resource Estimate
Inferred Resource*
145,700 oz @ 6.81 g/t
Indicated Resource*
276,100 oz @ 7.63 g/t
Proven & Probable**
175,093 oz @ 6.79 g/t
Current Resource model at US$1,250 with higher cut-off than prior resource models
Does not capture up to 13,000 meters of successful drilling from 2019 to 2021
Tightly defined mineralized domains which closer fit the geology of deposit
Conservative gold grade capping strategy defined by mineralized domains first and by composite
second resulting in a much more conservative capping of grades
Geology/Structure was used as a constraint for creating domains
Classification parameters for M&I were more tightly constrained
Blocks are larger and aligned with the dip and strike, however sub-blocking was used to more accurately
define volumes and tons
Conservative Resource Model with Considerable Upside
* National Instrument 43-101 Technical Report dated April 1, 2018: Preliminary Feasibility Study for the Copperstone Project, La Paz County, Arizona, USA
** 0.11 oz/t cut-off, $1,250/oz Au
A
ARIZONA
GOLD CORP