Champion Iron Project Overview and Cost Structure slide image

Champion Iron Project Overview and Cost Structure

APPENDIX: BLOOM LAKE → OPPORTUNITIES BEYOND LOM Released the details of the updated mineral resources and reserves for Bloom Lake on August 22, 2023, including: → Confirmed 18 years life of Mine ("LoM"), based on the mineral reserves, including an average annual production of 15.2M wmt of high purity iron ore concentrate at 66.2% Fe → Expanded opportunity beyond the LoM plan, including an increase to the measured and indicated ("M&I") resources by 40% and an increase to the inferred resources by 360% → Mineral resources and reserves based on a long-term P65 iron ore price of US$110.24/t and US$99.0/t, respectively, compared to the 3 and 5 year average P65 iron ore price of US$148.6/t and US$128.5/t, repectively¹ CHAMPION IRON ☑ TSX: CIA | ASX: CIA | OTCQX: CIAFF TECHNICAL REPORT HIGHLIGHTS Average recovered concentrate (M wmt/year) Life of mine (years) Average LoM operating cost / Total cash cost² (dmt) 15.2 18 years Mining Parameters C$64.6/t Average Stripping Ratio (waste:ore) 0.96 Average Fe Processing Recovery (%) 82.0% Iron Ore Price Parameters LoM average iron price at 66.2% Fe CFR China (based on P65 Index of US$99.0/t) US$100.9/t LoM average ocean freight cost Average Exchange Rate (CAD/USD) US$24.5/t 1.27 UPDATED MINERAL RESOURCES AND RESERVES Mineral Resource Estimate for Bloom Lake (15% Fe Cut-Off Grade, Undiluted) Category Tonnage (M dmt) MgO Fe (%) Cao (%) Al2O3(% Sat (%) (%) ) Measured Indicated Total M+I Inferred 186.7 30.4 1.3 5.5 1.3 0.3 1,065.5 28.4 1.3 6.1 1.2 0.5 1,252.2 28.7 1.3 6.0 1.2 0.5 246.3 26.6 1.4 6.4 1.2 0.5 Mineral Reserve Estimate for Bloom Lake (15% Fe Cut-Off Grade, Diluted) Category Proven Probable Total P&P Diluted Ore Tonnage MgO Fe (%) Cao (%) Sat (%) Al2O3(% (%) ) (M dmt) 183.7 30.0 1.3 5.6 1.3 0.3 532.5 28.1 2.1 9.2 2.0 0.5 716.2 28.6 1.9 8.3 1.8 0.4 Notes: See disclosure page for statement regarding the 2023 Technical Report 11 3 and 5-years average P65 iron ore prices based on calendar years 2018 to 20221 2 LOM operating costs divided by tonnage sold in dmt 29
View entire presentation