Enel FY 2022 Consolidated Results slide image

Enel FY 2022 Consolidated Results

FY 2022 consolidated results Pipeline Renewables Pipeline (GW) 462 74 245 enel 2023-25 Additional capacity targetĀ² Capacity in execution 11.2 21 GW Residual target 9.8 132 11.2 2023 target in execution 100% Gross Pipeline BESS 1 Early stage Mature In execution 2024 target in execution 70% 1. 2. It includes BESS for around 48 GW in early stage and around 26 GW in mature pipeline It includes both renewables and BESS 36
View entire presentation