Improving environment management
PowerChina incorporates environment
management into daily check and annual
appraisal and assessment. The Group
conducts strict entire-process supervision
and control over the environment
management status of subsidiary
companies. If any irregularity is found,
maximum fine can be up to USD100,000.
The company benchmarked the
environmental and social norms of
World Bank and international financial
companies, and signed the CA
Agreement and Its Supplementary
Environmental and Social Standard
Responsibility Agreement with the Laotian
government, expressly specifying that
the Nam Ou River project would follow
the principle of "adopting the highest
standard "in performing environmental
and social responsibility. According to the
CA agreement, the company formulates
the Specific Location Environmental
Monitor Plan considering the onsite
situation during the construction period,
and identifies factors impacting the
environment in different phases by
reviewing all the places, sites and
processes during the construction period;
for pollutants that cannot be recycled
or reclaimed, the company formulates
protection and control measures, and
conducts real-time tracking and monitor
to solidly protect the environment around
the project.
PowerChina Overseas Investment Co.,
Ltd. actively constructs the environment
management system, and pertinently
develops and executes a series of
environmental protection measures
including Sandstone Plant and Concrete
Mixing System Waste Water Treatment
Measures, Sealing Measures for Dry
Process of Stone Material Production
and Measures on Central Treatment of
Solid Waste, achieving environmental
protection targets like zero discharge of
construction waste water, zero dust in
the air, and zero pollution of construction
garbage.
In order to strengthen environmental
protection management, Nam Ou River
Basin Hydropower Co., Ltd. under
PowerChina sets up a "Environmental
Protection and Water Protection
Committee", releases the Charter of
Hydropower Station Environmental
Nam Ou River Phase II Project attaches importance to
environmental management
Nam Ou River Phase II Project has set up an environmental protection work leadership
team led by the general manager, appointed the HSE management office as the
responsible department, and designated dedicated personnel to be responsible for
the environmental protection work. The company printed and distributed Nam Ou
River Phase II Project Environmental Protection Management System, explicitly
specifying the responsibility and work content of all participating units, fully
identifying the handling process for waste water, sewage, solid waste, dust and noise;
it compiled Environmental Protection Facility Standardization Manual, absorbing the
environmental protection management experience of construction projects in China,
specifying construction site handling processes during the construction period, and
unifying environmental work standards.
"Emphasizing ecological and environmental protection is both the starting point
and the foothold for implementing projects. Starting from the design, we consider
environmental protection in advance. On the basis of complying with international
standards and Laos' local environmental requirements, we design a perfect
environmental protection work plan, obtain the approved environmental evaluation
report, and implement the ecological protection management of the Nam Ou River
project systematically in a standardized manner.
--Sheng Yuming, Chairman of PowerChina Overseas Investment Co., Ltd.
Power Construction Corporation of China
Protection and Water Protection
Committee, strictly performs the
agreement and follows international
environmental protection standards, and
invites the government and local people
to participate in the supervision to ensure
that environmental protection is solidly
implemented.
During period of the project feasibility
study, PowerChina fully identifies
environmental regulations of the Laotian
government and relevant requirements,
and engages third party institutions
with environmental protection monitor
qualification to conduct extensive
monitor of the environmental protection
work and assist the project to carry out
environmental protection work.
E
Environmental Protection Facility
Standardization Manual
ΣΙ
Laos' State Environment Ministry inspected the environmental
protection work of Nam Ou River Phase I Project
In June 2017, led by the Director of the Energy Project Environment Assessment Center
of Laos' State Environment Ministry, a natural and social environment inspection team
consisting of 24 people from Phongsali Provincial Environment Department, Muang
Khua County Environment Bureau and Muang Mai County Environment Bureau
conducted a comprehensive inspection of the environmental work of Nam Ou River
Level-4 Hydropower Station. The inspection team checked in detail construction areas
including the level-4 Hydropower Station mixing system, the mechanical repair factory,
the lab, the aggregate field and the No.2 slag disposal pit, as well as the treatment of
production and domestic sewage, treatment of solid waste, and dust prevention and
noise reduction of the site's living area, and gave a high affirmation of the environmental
protection work of the Nam Ou River project.
Implementing clean production
○ Waste water treatment: PowerChina
has set up multiple water quality monitor
points in the upper and lower reaches of
the construction site and conducts regular
check of the quality of river water. The
largest 3-stage sedimentation tank in Laos
is used to treat waste water, which can be
recycled after it is fully precipitated, thus
achieving the target of energy conservation
and emission reduction.
GQ
The environmental protection work
Nam Ou River Level-3 Hydropower Station strengthens industrial
waste water treatment
Nam Ou River Level-3 Hydropower Station makes the sandstone and aggregate
processing system a control priority for waste water discharge, and carried out rational
renovation according to actual conditions. When the sedimentation tank did not work
out well, the drainage was rationally remodeled by adding a submerged pump to pump
water for re-precipitation; by installing multiple advection-type aggregate filter pools,
there is zero waste water discharge in the dry season, and the discharge in the rainy
season meets the standard.
Industrial waste water treatment
Waste residue treatment: Central
waste treatment pools have been set up in
the construction sites of the Nam Ou River
cascade hydropower stations project, and
professional domestic waste collection
vehicles regularly collect domestic waste
of the sites for central incineration and
burial; waste tires and waste oil are piled
and treated centrally; and factors impacting
the environment are regularly monitored to
ensure that the environmental protection
work satisfies the requirements.
○ Dust treatment: In the production
system of Nam Ou River Level-1 Hydropower
Station, special dust removal equipment
is adopted to mitigate the impact on
environment of the dry production process;
production machines are completely
enclosed to minimize dust. In the level-2
Hydropower Station, six sprinklers operate
at fixed time and location; the mixing
station is upgraded to a mixing building
as the aggregate production equipment,
dust removal facilities are added, and a
3-stage sedimentation tank is installed,
which is regularly cleaned every one or
two days. PowerChina Cement Co., Ltd.
carried out a large scale transformation
of the dust removal equipment, changed
the skeleton of the dust removal bag
and the polar line and polar plate of the
electrostatic precipitator of the kiln head,
cleaned the dust in the porcelain bottle
of the electrostatic precipitator of the kiln
inlet, replaced the soft connection of the
bulk cement discharge skeleton, and
implemented clean transportation and
planted trees.