FACILITY
OPERATIONAL
COUNTRY
FACILITY STATUS
FACILITY INDUSTRY
DATE
CAPTURE
CAPACITY
FACILITY STORAGE CODE
Mtpa CO2
ABU DHABI CCS (PHASE 1 BEING EMIRATES STEEL INDUSTRIES)
ILLINOIS INDUSTRIAL CARBON CAPTURE AND STORAGE
CNPC JILIN OIL FIELD CO2 EOR
United Arab
Emirates
Operational
2016
Iron and Steel Production
0.8
Enhanced Oil Recovery
USA
Operational
2017
Ethanol Production
1
Dedicated Geological
Storage
China
Operational
2018
Natural Gas Processing
0.6
Enhanced Oil Recovery
GORGON CARBON DIOXIDE INJECTION
Australia
Operational
2019
Natural Gas Processing
4
Dedicated Geological
Storage
QATAR LNG CCS
Qatar
Operational
2019
Natural Gas Processing
2.2
Dedicated Geological
Storage
ALBERTA CARBON TRUNK LINE (ACTL) WITH NORTH WEST REDWATER
PARTNERSHIP'S STURGEON REFINERY CO2 STREAM
Canada
Operational
2020
Oil Refining
1.6
Enhanced Oil Recovery
ALBERTA CARBON TRUNK LINE (ACTL) WITH NUTRIEN CO2 STREAM
Canada
Operational
2020
Fertiliser Production
0.3
Enhanced Oil Recovery
ORCA
Iceland
Operational
2021
Direct Air Capture
Dedicated Geological
0.004
Storage
GLACIER GAS PLANT MCCS
Canada
Operational
2022
Natural Gas Processing
0.2
Dedicated Geological
Storage
SINOPEC QILU-SHENGLI CCUS
RED TRAIL ENERGY CCS
CNOOC SOUTH CHINA SEA OFFSHORE CCS
China
Operational
2022
Chemical Production
1
USA
Operational
2022
Ethanol Production
0.18
Enhanced Oil Recovery
Dedicated Geological
Storage
China
In Construction
2023
Natural Gas Processing
0.3
Enhanced Oil Recovery
GUODIAN TAIZHOU POWER STATION CARBON CAPTURE
China
In Construction
2023
Power Generation
0.3
Enhanced Oil Recovery
SANTOS COOPER BASIN CCS PROJECT
Australia
In Construction
2023
Natural Gas Processing
Dedicated Geological
1.7
Storage
MAMMOTH
Iceland
In Construction
2024
Direct Air Capture
0.03
Dedicated Geological
Storage
NORCEM BREVIK - CEMENT PLANT
Norway
In Construction
2024
Cement Production
0.4
N/A
NORCEM BREVIK - SHIPPING ROUTE
Norway
In Construction
2024
Cement Production
N/A
NORTHERN LIGHTS - STORAGE
Norway
In Construction
2024
Various
Dedicated Geological
Storage
1POINTFIVE DIRECT AIR CAPTURE FACILITY
USA
In Construction
2024
Direct Air Capture
0.5
Dedicated Geological
Storage
HAFSLUND OSLO CELSIO- KLEMETSRUD WASTE TO ENERGY PLANT
Norway
In Construction
2025
Waste Incineration
0.4
N/A
NORTH FIELD EAST PROJECT (NFE) CCS
Qatar
In Construction
2025
Natural Gas Processing
1
Under Evaluation
[54]