Investor Presentaiton
Juby Mineral Resources
Juby Mineral Resources effective July 14, 2020
Tonnes
Grade Au
Contained Au
Zone
Category
(Mt)
(g/t)
(koz)
Juby Main Zone and Golden Lake Zone
Indicated
20.2
1.12
728
Inferred
41.5
0.99
1,319
Hydro Creek-La Carte Zone and Big Dome Zone
Indicated
1.1
1.31
45
Inferred
5.6
0.93
169
Total
Indicated
Inferred
21.3
1.13
733
47.1
0.98
1,488
Notes:
1.
2.
345
Mineral resources are not mineral reserves and have no demonstrated economic viability.
The mineral resource estimate was prepared by Allan Armitage, Ph.D., P.Geo. of SGS Geological Services, and Joe Campbell, B.Sc., P.Geo., Alan Sexton, M.Sc., P.Geo., and Duncan Studd, M.Sc.
P.Geo. of GeoVector Management Inc, who are Qualified Persons as defined by National Instrument 43-101. Mr. Armitage, Campbell, Sexton, and Studd have reviewed and verified the drilling,
sampling, assaying, and QAQC protocols and results, and are of the opinion that the sample recovery, preparation, analyses, and security protocols used for the mineral resource estimate are
reliable for that purpose.
Totals may not add up due to rounding.
Mineral resources are reported above an optimized pit shell with a cut-off grade of 0.4 g/t gold, based on a metal price of USD$1,450 per ounce of gold, and a metallurgical recovery of 90%.
There are no known legal, political, environmental, or other risks that could materially affect the potential development of the mineral resources.
ARIS GOLD
24View entire presentation