Investor Presentaiton
MINERAL RESOURCE TABLE - DECEMBER 2019
Gruyere Project Joint Venture - 100% basis
Gold Road Attributable
Tonnes
Grade
Contained Metal
Tonnes
Project Name / Category
Gruyere Total
(Mt)
(g/t Au)
(Moz Au)
(Mt)
Grade
(g/t Au)
Contained Metal
(Moz Au)
137.95
1.31
5.79
68.97
1.31
2.90
Measured
14.55
1.09
0.51
7.27
1.09
0.26
Indicated
118.19
1.33
5.05
59.10
1.33
2.52
Measured and Indicated
132.74
1.30
5.56
66.37
1.30
2.78
Inferred
5.21
1.39
0.23
2.61
1.39
0.12
Golden Highway + YAM14 Total
15.57
1.46
0.73
7.78
1.46
0.36
Measured
0.29
1.99
0.02
0.14
1.99
0.01
Indicated
11.33
1.48
0.54
5.67
1.48
0.27
Measured and Indicated
11.62
1.50
0.56
5.81
1.50
0.28
Inferred
3.95
1.33
0.17
1.98
1.33
0.08
Central Bore
0.24
13.05
0.10
0.12
13.05
0.05
Measured
Indicated
Measured and Indicated
Inferred
0.24
13.05
0.10
0.12
13.05
0.05
Total Gruyere JV
153.76
1.34
6.62
76.88
1.34
3.31
Measured
14.84
1.11
0.53
7.42
1.11
0.26
Indicated
129.52
1.34
5.59
64.76
1.34
2.79
Measured and Indicated
144.36
1.32
6.12
72.18
1.32
3.06
Inferred
9.40
1.66
0.50
4.70
1.66
0.25
GOLD
ROAD
Continued on following slide
PAGE 25View entire presentation