2013 Processing & Mining Performance
Efficiency program
Project
1
Drill rods management
2
Performance management of
excavator operators
3
Pit practice improvement
•
•
•
Description
Test rods from different suppliers
Choose the most suitable for us with longest life
Finalization of testing of excavators at Berezitovy mine and installation of
Taparko in case of success
Will allow to decrease loading cycle, improve load volume, manage
performance of operators
Installation of radios in the mining equipment
Implementation of simple dispatch system
Decrease down time for fueling and greasing of the mining fleet
•
Usage of the tires with suitable TKPH ratio
4
Optimization of downtime for
•
fueling and greasing
5
Tire life improvement
6
Elimination of overloading of DT
.
7
8
•
Have hungry boards not higher than 250mm
Have payload lights on new trucks mounted so they are visible by the shovel
operator
Reduce the time and cost for lining truck trays
Decrease cost on Ground Engaging Tools, Eliminate welded adaptors as
support for the teeth.
•
Ramp management
Base competency trainings for mining fleet operators
Dedicated component shop and shop for drills repair
Chromium Carbide liners for DT
•
•
and KVX system for excavators
Other projects without clear
economical effect