Eldorado Gold Operational and Financial Update slide image

Eldorado Gold Operational and Financial Update

Perama Hill OVERVIEW Location Ownership Low-cost epithermal gold-silver project with transformative growth potential Perama Hill RESERVES AND RESOURCES (2) Contained Thrace, Greece 100% Mine type Open pit Metals Gold, Silver mined Deposit type Epithermal gold-silver Life of mine(3) 10 years based on Reserves GREECE Athens Tonnes (x1000) Grade Grade Ounces Contained Ounces (g/t Au) (g/t Ag) (x1000 Au) (x1000 Ag) P&P Reserves 12,498 3.11 1,250 7 2,680 TÜRKIYE M&I Resources 14,066 3.04 1,374 7 2,994 Inferred Resources 1,136 1.63 59 2 83 Grades (3) Expected production (3) Expected costs (3) High grade (3.2 g/t), open pit strip ratio of ~0.3 Approximately 100,000 oz Au per year Cash operating costs (1) $430/oz (1) eldorado gold (2) (3) Mediterranean Sea • Europe • Supports the Growth Pipeline Next mine expected to be developed after Skouries Exploration potential in the Thrace region supports opportunities for growth Excluded from Hellas Gold Greek bank financing and not guaranteed under Senior Notes These are non-IFRS financial measures or ratios. See Slide 2 'Non-IFRS Measures' for more information. Please refer to the Appendix for more information with respect to the mineral resources and mineral reserves. Data here and elsewhere in this presentation is from the Perama Hill Technical Report dated January 2010. 26
View entire presentation