Investor Presentaiton slide image

Investor Presentaiton

OVERVIEW OF NORTHPARKES Asset overview1 Commodities Evolution ownership Mine Life Operator Location Mine type & mining method Copper, Gold, Silver 80% ~30 years Evolution New South Wales, Australia Block caving + Sub-level caving + Open pit Permitted to 8.5Mtpa with current mill capacity of Mill throughput 7.6Mtpa ~6.5Mtpa from underground operations supplemented periodically by open cut and/or stockpiles Grinding & flotation plant Processing method Recovery (YTD)² Product Production³ (FY24E full year, 80% basis) Mineral Resource4 (Reported on a 100% basis) Ore Reserves4 (Reported on a 100% basis) 83% Cu 71% Au Copper-gold-silver concentrate 25kt Cu, 38koz Au 628 Mt @ 0.55% Cu and 0.20g/t Au Contained 3,435kt Cu and 4,099koz Au 101 Mt @ 0.53% Cu and 0.27g/t Au Contained 537kt Cu and 880koz Au 1. See also "Limitation on information in relation to the Northparkes Mine" in Important Notices Northparkes site layout E27 E22 Tailing storage Concentrator E48 E28NE E31N E28 E31 Mining operations centre E26 500m Evolution MINING 2. Based on Evolution's due diligence and information provided by CMOC. YTD recoveries for the period from January ending October 2023 3. Forecast production shown on a full year basis to 30 June 2024 at the 80% interest level of Evolution. Evolution only entitled to production post transaction close. Based on Evolution's due diligence and information provided by CMOC 4. Evolution reports Northparkes Mineral Resource and Ore Reserve on a 100% basis but is attributed 80%. Full details are provided in the ASX announcement accompanying this investor presentation 17
View entire presentation