Investor Presentaiton
CRESCENT POINT | CORPORATE PRESENTATION
Alberta Montney Results & Development Plan
Focused on efficient development of resource by optimizing landing zone and number of wells drilled per section
R7
R2
R1W6
Gold Creek West Recent Wells
Peak 30-day rate (boe/d): 1,200 - 2,000
Liquids: 70-85%
Gold Creek West
Black Oil
Volatile Oil
Liquids-Rich
T70
T69
T68
Gas
Lean Gas
T67
T66
T65
T64
T63
HHRS Karr West Recent Wells
Peak 30-day rate (boe/d): >1,500
Liquids: >60%
CPG Lands
HHRS Lands
CPG Recent Results
HHRS Recent Results
■■■ Over Pressure Line
R7
R6
All figures are approximates.
Gold Creek Recent Wells
Peak 30-day rate (boe/d): 900 - 1,350
Liquids: 55-70%
Gold Creek
Karr West
Karr East
Kar East Recent Wells
Peak 30-day rate (boe/d): 700
Liquids: 92%
R5
R4
R3
R2
R1W6
T69
T68
T67
T66
T65
T64
T63
CPG's Existing Montney Development Plan:
•
•
•
CPG optimized well design by landing lower in middle Montney formation
and deploying a larger frac to enhance EURs across multiple benches
Ability to execute 'elevator fracs' based on consistent pressure gradients
Currently drilling 5-7 wells per section
Development Plan For Acquired Assets:
Opportunity to enhance well design and reduce wells drilled per section
(HHRS currently drills 10-11 wells per section across its land base)
In Gold Creek & Karr East (both normally pressured lands), CPG plans to drill up
to 7 wells per section across one bench with a larger frac design
In Karr West (slightly over pressured lands), CPG plans to drill 8 wells per section
across two benches with an optimized frac design
A
B
C
Lower
HHRS
10 11 wells/section
C
Lower
Karr West
(CPG Optimization)
8 wells/section
A
B
C
Lower
Gold Creek / Karr East
(CPG Existing)
5-7 wells/section
6View entire presentation