THE ROSE PROJECT: MINE & CONCENTRATOR
Mine and concentrator 2022 feasibility study results (cont'd)
LOM Average Annual Production Volumes
Technical Grade
Spodumene 6.0%
51,369 t
Chemical Grade
Spodumene 5.5%
Tantalum
Concentrate 20.0%
173,317 t
441 t
Technical Grade
Spodumene 6.0%
LOM Average Recoveries
Chemical Grade
Spodumene 5.5%
Tantalum
Concentrate 20.0%
87%
90%
40%
0.87% Li₂O
138 ppm Ta₂05
Average Feed Grade
4,600 t/d (1.6 M t/y)
Mill Throughput
Source: Critical Elements Lithium Corporation - NI 43-101 Technical Report on Rose Lithium-Tantalum project feasibility study dated July 26, 2022
CriticalElements
Lithium Corporation
Pilot Plant & Metallurgical Results
■ 50 tonne pilot program confirmed
feasibility recovery rates and
concentrate grade with 6.41% Li₂O for
Rose, and 6.56% Li₂O for Rose South
Variability testing from 0.50% to 1.60%
Li₂O through the deposit to test
recovery consistency
■ Tantalum recoveries average 69.1% in
pilot testing