Investor Presentaiton slide image

Investor Presentaiton

Cactus Equipment Positioned on a 4-Well Pad 4 3 4 2 4 Product Sold 2 Equipment Rented 3 Equipment Rented 4 Services Provided 1 Cactus Product Sold ■ Wellheads are required by each well over production life ■ One of the first pieces of equipment to be installed ■ Cactus wellheads installed below surface ■ Frac stacks are connected to the wellhead for the fracturing phase of a well ■ Must reliably withstand all liquids and proppants that are pumped downhole to fracture Zipper manifolds used during the fracturing process ■ Allow fracing to seamlessly shift from well to well without connecting and disconnecting high- pressure equipment Variety of equipment to install and service pressure control equipment, such as high-pressure flow iron, closing units, crane trucks, grease units and testing units ■ Production trees (not pictured above) are installed on the wellhead after the frac stacks are removed ■ Manage the production flow over the life of the well Note: Cactus equipment shown not inclusive of recent innovations described on preceding slides. 27
View entire presentation