Investor Presentaiton
Construction environment
(Interim Storage Facility)
Project
Waste disposal treatment in Futaba Town
reduction storage facility (intermediate storage
Client
facility) Part 2
Ministry of the Environment
Fukushima Regional
Environment Office
Place of construction: Futaba-machi, Futaba-gun,
Fukushima Prefecture
Construction Outline: Stoker type incinerator
(processing capacity: 200 t/
day) Coke bed type melting
furnace (processing
capacity: 150t / day)
Construction period: Mar 2018 ~ Mar 2023
Road Bridge
Project
Bridge at road No.52 and other 3 bridges
over New Tomei Express way (PC upper part)
Client
Chuo Nippon Expressway
Co., Ltd. (NEXCO)
Place of construction: Hadano City, Kanagawa
Prefecture
Construction Outline PRC box girder bridge (L)=
61.5m,42.5m, 2 furnace
PRC 2 main plate girder bridge
(L)=49.0m,51.1m, 2 furnace
Construction period: Jul 2018
~
Oct 2022
THO
MARDEN
2000
1800
7000
3500
中心線
通路中心線
コンクリート
2.05
550 800
[600]
2100
1535
【現在の施工状況10/25時点】
750
3025
1500
4750
2225
2650-1406
2000
24472-12095
20137-7000
アスファルト舗装 50mm_
(別逃工事)
KLO
15
-15
2.000%
-GD
36View entire presentation