FEASIBILITY STUDY - CAPITAL COST SUMMARY
Area
Detail
Initial
CAPEX
Sustaining Closure
CAPEX
CAPEX
(M $)
(M $)
(M $) (2)
Mine Costs (1)
84
119
Total
CAPEX
(M$)
203
Processing Plant
433
49
483
Direct Costs
Notes:
1. Initial mining CAPEX includes
environmental remediation costs.
2. Closure and mitigation assume
self-performed costs, which will
differ for those assumed for
financial assurance calculations
required by regulators. Costs
include stream and wetland
On-Site Infrastructure
191
84
275
restoration and reclamation costs.
Off-Site Infrastructure
116
116
3. Numbers have been rounded and
may not sum correctly.
Indirect Costs
233
-
-
233
Owner's Costs
38
Offsite Environmental Mitigation Costs
14
I
I
38
Onsite Mitigation, Monitoring and
3
23
98
125
Closure Costs (2)
Total CAPEX without Contingency (3)
1,113
275
98
1,487
Contingency
150
20
1
171
14
Based on the 2020 Feasibility Study (FS)
which is intended to be read as a whole
and sections should not be read or relied
upon out of context. The information in
this presentation is subject to the
assumptions, exclusions and qualifications
contained in the FS. See "Regulatory
Information" at the end of this
presentation. For a summary of differences
between the FS and TRS, see "Cautionary
Note and Technical Disclosure" at the
beginning of this presentation.
Total CAPEX with Contingency (3)
1,263
296
99
1,658
34