Investor Presentaiton
Pani - Commencement of Step-Out Drilling
•
•
•
•
•
Comments
JV with J Resources to develop a
combined project. Signed and expected to
close H2 2020, pending regulatory and J
Resources' lenders' approvals -
Merdeka's economic share is 40% and
Merdeka controls the JV
Expect greater resources to reserve
conversion and better economics from
combined project
Outcrops, thick, low strip implying low cost
mining
Initial metallurgical testing shows high
recoveries from CIL, heap leach and
gravity
Diamond drilling continued throughout Q2
2020 using a single man portable drill rig
with 8 holes completed or underway for a
total of 1,423 metres. This brought total
drilling in the current program to 9 holes
completed or underway for a total of 1,829
metres. The planned program comprises
40 drill holes located on 29 drill pads for a
total of approximately 10,500 metres
MERDEKA
COPPER GOLD
Overhead & Cross Sectional Illustration of Planned Step-Out
62500mN
387500mE
Drilling Between PANI COW & PANI IUP
J Resources' Resource
72.7 MT at 0.98 g/t Au for 2.30 Moz
(Cut off grade 0.4 g/t Au) Reported 31/12/2018
62000mN
Proposed Drilling 2019-2020
Completed Drilling
Historical Drilling
IUP Pani
Cross Sectional Viewi
FILE 62,200mN
.
Drilling has been paused up till completion
of the JV
62,000mN
388000mE
388000mE-
! KUD/IUP BOUNDARY
OPEN
Base Oxidati
STEP OUT
DRILLING
388500mE
388500mĘ
389000mE
Mineral Resource Estimate
89.5 MT at 0.82 g/t Au for 2.37 Moz
(Cut off grade 0.2 g/t Au) Reported 03/12/2014
389000mE.
62500mN
62000mN
61500mN
100
0
100m
KUD/IUP BOUNDARY
Potential Pit Shape
Drill trace
1. Two holes drilled by Utah International in 1982 between the two resources, assayed 406m @ 0.5g/t (GPD-04) and 154m @ 0.57g/t (GPD-05)
2. Pani IUP Resource estimate from SRK Report dated December 2014 based on 137 Diamond Drill holes, 26,000m drilling and using cut off grade of 0.2g/t Au
Note:
22
22View entire presentation