Livent's Strategic Growth and Sustainability Goals
•
•
4 Livent
1a Salar del Hombre Muerto
Livent Argentina Operations (Catamarca Province)
Commenced operations at the salar in 1997; 25 years of
historical operations
Hold mineral concession rights through subsidiary MdA
to extract lithium brine without time or volume limitations
Uses a proprietary Direct Lithium Extraction (DLE)
technology that speeds up conversion and reduces land
footprint; results in leading sustainability profile
Recently published first Resources & Reserves report
highlighting the strengths of the resource and our
operations:
High-grade lithium brine with historical production
>740 mg/L (605ppm) and very low variability
✓ Large resource covering roughly 600 square
kilometers (in its entirety) with depths potentially
extending to 900+ meters below ground surface
Current production does not extend below 40m
and inferred resource only reaches 200m
Easily supports expansion in a sustainable manner
•
Increasing lithium carbonate production capacity
by five-times (100,000 metrics tons total) by the
end of the decade
Proven and probable reserves make up roughly
one-third of total resource today
Category
Lithium
(K Mt)
Measured (0-40 m)
Indicated (40-100 m)
Total Measured & Indicated
Inferred (100-200 m)
Total Measured, Indicated & Inferred
Lithium Carbonate
Equivalent
(LCE) (K Mt)
523
2,783
805
4,288
1,328
7,071
892
4,749
2,220
11,820
Note: K Mt thousand metric tons; values rounded to the nearest thousand; as of December 31, 2022.
For further information, see the technical report titled "Resource and Reserve Report, Pre-Feasibility Study, Salar del Hombre Muerto, Argentina, prepared by
Integral Consulting Inc. dated February 21, 2023, filed as exhibit 96.1 to Form 10-K on February 24, 2023.
18View entire presentation