FURTHER DECARBONISATION CAN BE REALIZED FOR
INSTANCE THROUGH A NEW GAS POWER PLANTS AS
A REPLACEMENT FOR COAL POWER PLANTS
Possible other locations for the development of gas sources of ČEZ
■ The following ČEZ locations can be considered for possible construction of new gas plants:
ČEZ location
Prunéřov
Tušimice
Mělník
Estimated installed capacity * (MWe)
Gas connection length (km)
800
2 x 850
800**
11
10.8
5
up to 800
1.4
Počerady
Possible development in the Počerady location even after the sale of coal-fired Počerady Power
Plant
■ According to the above, the possibility of constructing a new gas source in Počerady remains:
➤ Sufficient capacity of the existing gas connection owned by ČEZ
Electricity connection (reservation of capacity) is associated with a cost of 0.5 m CZK/MW (i.e.
CZK 400 m for 800 MW),
.
The connection is not an entitlement by default, ČEPS shall assess the application and either
approve it or determine the conditions under which the source can be connected.
The capacity of the connection should be sufficient, as it has recently been doubled
■ There will be sufficient space for a new source, even after the sale of the lignite power plant and its
related lands, including the land for construction of a new coal plant by Vršanská uhelná.
11 Note: * In relation to the capacity of the gas connection; ** After decommissioning of EME3, 500 MW, is available with no additional costs for ČEZ