Gatos Silver Investor Presentation Deck
Extended Mine Life by ~3 years to end 2030
Increases in Mineral Resource and Reserve primarily driven by drilling
Additional 62 km of drilling in 335 drillholes
Legend
Developed / mined
2023 Mineral Reserve
2023 Mineral Resource Measured
and Indicated
2023 Mineral Resource - Inferred
Additional drilling (Apr'22 - Mar'23)
Plunge 00
Azimuth 030
0
100 200 300
+1500
masl
+1200
+900
+600
2023 LOM Plan exceeded target of 1 to 2 year life extension
+ Substantial additional drilling
■ Conversion of higher-grade
inferred material
I
▪
GATOS
SILVER
+ 46% increase in silver production
over LOM Plan
First stage of SE Deeps
definition drilling
▪ Maiden inferred resource for SE
Deeps
+ Low risk mine design with
operational flexibility
■
▪ ~2,950 tpd mining rates similar
to current operations
■
Maximizing use of longhole
methods (74% of stope tonnage)
Critical underground
infrastructure in place
23View entire presentation