ADB-PLN Electrical Grid Strengthening Program
Investment planning has neglected networks leading to higher ADB
costs and inadequate reliability.
Unrealistic demand and generation planning led to
greatly exceeded reserve margins
Meanwhile, inadequate networks mean that service
quality remains poor in many regions.
Capacity (MW)
100,000
90,000
80,000
70,000
60,000
50,000
40,000
50%
Aceh
45%
40%
35%
30%
25%
20%
Margin (%)
Kep. Riau
Kalimtan Utara
Sumatera Utara
Kep. Riau
uku Utara
Kalimantan Timur
dlawesi Utara
Kalimantan Barat
Sororitdi
Sumatera Barat
Sulawestengah
Kalimantan Tengah
Sulawesi Barat
Ben
Sumatera Selatan
tan Selatan 1
Sulawesi Selatan Sulawesi Tenggara
Lambung
DKI Jakarta
Banten Jawa Bara
Jawa Tengah
Jawa Timur
D. I Yogyakarta
Nusa Tenggara Barat
30,000
20,000
15%
10%
SAIDI [hours/year]
< 6 Highly Satisfactory
10,000
5%
6-12 Satisfactory
12-24 Marginally Satisfactory
0
0%
24-36 Unsatisfactory
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
>36 Highly Unsatisfactory
Existing (Derated)
Ongoing and Committed
Planned
Target reserve margin
Planned reserve margin
Source: RUPTL 2019-28.
Date 23rd Feb 2021
Source: Processed based on
Statistik PLN 2018
Source: PLN Statistics 2018.
Papua Barat